HTS Heading 2610

Chromium ores and concentrates

All 3 HTS codes under heading 2610 (chromium ores and concentrates), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 2610

  • 2610.00.00 Chromium ores and concentrates: General Free; Special none; Column 2 Free.
  • 2610.00.00.20 Having a chromium content equivalent to not more than 40 percent chromic oxide (Cr2O3) (t, Cr2O3 t).
  • 2610.00.00.40 Having a chromium content equivalent to more than 40 percent but less than 46 percent chromic oxide (Cr2O3) (t, Cr2O3 t).
  • 2610.00.00.60 Having a chromium content equivalent to 46 percent or more chromic oxide (Cr2O3) (t, Cr2O3 t).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.