HTS Heading 2611

Tungsten ores and concentrates

All 2 HTS codes under heading 2611 (tungsten ores and concentrates), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 2611

  • 2611.00 Tungsten ores and concentrates.
  • 2611.00.30.00 Ores (under: Tungsten ores and concentrates) (kg, W kg): General Free; Special none; Column 2 $1.10/kg on tungsten content.
  • 2611.00.60.00 Concentrates (under: Tungsten ores and concentrates) (kg, W kg): General 37.5¢/kg on tungsten content; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $1.10/kg on tungsten content.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.