HTS Heading 2613
Molybdenum ores and concentrates
All 2 HTS codes under heading 2613 (molybdenum ores and concentrates), with their duty rates from the 2026 HTS Revision 23.
Every line of heading 2613
- 2613 Molybdenum ores and concentrates.
- 2613.10.00.00 Roasted (under: Molybdenum ores and concentrates) (kg, Mo kg): General 12.8¢/kg on molybdenum content + 1.8%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 $1.10/kg on molybdenum content + 15%.
- 2613.90.00.00 Other (under: Molybdenum ores and concentrates) (kg, Mo kg): General 17.8¢/kg on molybdenum content; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 77.2¢/kg on molybdenum content.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.