HTS Heading 2614

Titanium ores and concentrates

All 3 HTS codes under heading 2614 (titanium ores and concentrates), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 2614

  • 2614.00 Titanium ores and concentrates.
  • 2614.00.30.00 Synthetic rutile (under: Titanium ores and concentrates) (kg): General Free; Special none; Column 2 30%.
  • 2614.00.60 Other (under: Titanium ores and concentrates): General Free; Special none; Column 2 Free.
  • 2614.00.60.20 Ilmenite and ilmenite sand (under: Other) (kg).
  • 2614.00.60.40 Other (including rutile and rutile sand) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.