HTS Heading 2616

Precious metal ores and concentrates

All 10 HTS codes under heading 2616 (precious metal ores and concentrates), with their duty rates from the 2026 HTS Revision 23.

Every line of heading 2616

  • 2616 Precious metal ores and concentrates.
  • 2616.10.00 Silver ores and concentrates (under: Precious metal ores and concentrates): General 0.8¢/kg on lead content; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 8.8¢/kg on copper content + 3.3¢/kg on lead content + 3.7¢/kg on zinc content.
  • 2616.10.00.10 Copper content (under: Silver ores and concentrates) (Cu kg).
  • 2616.10.00.20 Lead content (under: Silver ores and concentrates) (Pb kg).
  • 2616.10.00.30 Zinc content (under: Silver ores and concentrates) (Zn kg).
  • 2616.10.00.40 Silver content (under: Silver ores and concentrates) (Ag g).
  • 2616.10.00.80 Gold content (under: Silver ores and concentrates) (Au g).
  • 2616.90.00 Other (under: Precious metal ores and concentrates): General 1.7¢/kg on lead content; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 8.8¢/kg on copper content + 3.3¢/kg on lead content + 3.7¢/kg on zinc content.
  • 2616.90.00.10 Copper content (under: Other) (Cu kg).
  • 2616.90.00.20 Lead content (under: Other) (Pb kg).
  • 2616.90.00.30 Zinc content (under: Other) (Zn kg).
  • 2616.90.00.40 Gold content (under: Other) (Au g).
  • 2616.90.00.50 Other precious metal content (under: Other) (g).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.