HTS Heading 2617
Other ores and concentrates
All 3 HTS codes under heading 2617 (other ores and concentrates), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 2617
- 2617 Other ores and concentrates.
- 2617.10.00.00 Antimony ores and concentrates (kg, Sb kg): General Free; Special none; Column 2 Free.
- 2617.90.00 Other (under: Other ores and concentrates): General Free; Special none; Column 2 Free.
- 2617.90.00.30 Beryllium ores and concentrates (kg).
- 2617.90.00.60 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.