HTS Heading 2619

Slag, dross (other than granulated slag), scalings and other waste from the manufacture of iron or steel

All 2 HTS codes under heading 2619 (slag, dross (other than granulated slag)), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 2619

  • 2619.00 Slag, dross (other than granulated slag), scalings and other waste from the manufacture of iron or steel.
  • 2619.00.30.00 Ferrous scale (under: Slag, dross (other than granulated slag), scalings and other waste from the manufacture of iron or steel) (t): General Free; Special none; Column 2 73.8¢/t.
  • 2619.00.90.00 Other (under: Slag, dross (other than granulated slag), scalings and other waste from the manufacture of iron or steel) (kg): General Free; Special none; Column 2 Free.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.