HTS Heading 2620

Slag, ash and residues (other than from the manufacture of iron or steel), containing arsenic, metals or their compounds

All 36 HTS codes under heading 2620 (slag), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5%.

Every line of heading 2620

  • 2620 Slag, ash and residues (other than from the manufacture of iron or steel), containing arsenic, metals or their compounds.
  • 2620.11.00.00 Hard zinc spelter (under: Containing mainly zinc) (kg): General Free; Special none; Column 2 5%.
  • 2620.19 Other (under: Containing mainly zinc).
  • 2620.19.30.00 Zinc dross and zinc skimmings (kg, Zn kg): General Free; Special none; Column 2 3.3¢/kg.
  • 2620.19.60 Other (under: Other): General 0.7¢/kg on copper content + 0.7¢/kg on lead content; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 8.8¢/kg on copper content + 3.3¢/kg on lead content + 3.7¢/kg on zinc content.
  • 2620.19.60.10 Copper content (under: Other) (Cu kg).
  • 2620.19.60.20 Lead content (under: Other) (Pb kg).
  • 2620.19.60.30 Zinc content (under: Other) (Zn kg).
  • 2620.19.60.40 Silver content (under: Other) (Ag g).
  • 2620.19.60.50 Gold content (under: Other) (Au g).
  • 2620.21.00 Leaded gasoline sludges and leaded anti-knock compound sludges: General Free; Special none; Column 2 8.8¢/kg on copper content + 3.3¢/kg on lead content + 3.7¢/kg on zinc content.
  • 2620.21.00.10 Copper content (under: Leaded gasoline sludges and leaded anti-knock compound sludges) (Cu kg).
  • 2620.21.00.20 Lead content (under: Leaded gasoline sludges and leaded anti-knock compound sludges) (Pb kg).
  • 2620.21.00.30 Zinc content (under: Leaded gasoline sludges and leaded anti-knock compound sludges) (Zn kg).
  • 2620.21.00.40 Silver content (under: Leaded gasoline sludges and leaded anti-knock compound sludges) (Ag g).
  • 2620.21.00.50 Gold content (under: Leaded gasoline sludges and leaded anti-knock compound sludges) (Au g).
  • 2620.29.00 Other (under: Containing mainly lead): General Free; Special none; Column 2 8.8¢/kg on copper content + 3.3¢/kg on lead content + 3.7¢/kg on zinc content.
  • 2620.29.00.10 Copper content (under: Other) (Cu kg).
  • 2620.29.00.20 Lead content (under: Other) (Pb kg).
  • 2620.29.00.30 Zinc content (under: Other) (Zn kg).
  • 2620.29.00.40 Silver content (under: Other) (Ag g).
  • 2620.29.00.50 Gold content (under: Other) (Au g).
  • 2620.30.00 Containing mainly copper (under: Slag, ash and residues (other than from the manufacture of iron or steel), containing arsenic, metals or their compounds): General Free; Special none; Column 2 8.8¢/kg on copper content + 3.3¢/kg on lead content + 3.7¢/kg on zinc content.
  • 2620.30.00.10 Copper content (under: Containing mainly copper) (Cu kg).
  • 2620.30.00.20 Lead content (under: Containing mainly copper) (Pb kg).
  • 2620.30.00.30 Zinc content (under: Containing mainly copper) (Zn kg).
  • 2620.30.00.40 Silver content (under: Containing mainly copper) (Ag g).
  • 2620.30.00.50 Gold content (under: Containing mainly copper) (Au g).
  • 2620.40.00 Containing mainly aluminum (under: Slag, ash and residues (other than from the manufacture of iron or steel), containing arsenic, metals or their compounds): General Free; Special none; Column 2 Free.
  • 2620.40.00.30 Vanadium bearing materials (under: Containing mainly aluminum) (kg, V2O5 kg).
  • 2620.40.00.60 Other (under: Containing mainly aluminum) (kg).
  • 2620.60 Containing arsenic, mercury, thallium or their mixtures, of a kind used for the extraction of arsenic or those metalsor for the manufacture of their chemical compounds.
  • 2620.60.10.00 Of a kind used only for the extraction of arsenic or the manufacture of its chemical compounds (kg): General 5%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 25%.
  • 2620.60.90.00 Other (under: Containing arsenic, mercury, thallium or their mixtures, of a kind used for the extraction of arsenic or those metalsor for the manufacture of their chemical compounds) (kg): General Free; Special none; Column 2 30%.
  • 2620.91.00.00 Containing antimony, beryllium, cadmium, chromium or their mixtures (kg): General Free; Special none; Column 2 30%.
  • 2620.99 Other (under: Other).
  • 2620.99.10.00 Containing mainly vanadium (under: Other) (kg, V2O5 kg): General Free; Special none; Column 2 Free.
  • 2620.99.20.00 Containing mainly tungsten (under: Other) (kg, W kg): General 17.6¢/kg on tungsten content + 3.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $1.32/kg on tungsten content + 40%.
  • 2620.99.30.00 Materials not provided for elsewhere in this heading containing by weight over 10 percent nickel (kg, Ni kg): General Free; Special none; Column 2 Free.
  • 2620.99.50.00 Slag containing by weight over 40 percent titanium, and which if containing over 2 percent by weight of copper, lead, or zinc is not to be treated for the recovery thereof (kg): General Free; Special none; Column 2 Free.
  • 2620.99.75 Other materials which are residues not advanced in value or condition by any means, and which if containing over 2 percent by weight of copper, lead or zinc are not to be treated for the recovery thereof: General Free; Special none; Column 2 Free.
  • 2620.99.75.20 Vanadium bearing materials (under: Other materials which are residues not advanced in value or condition by any means, and which if containing over 2 percent by weight of copper, lead or zinc are not to be treated for the recovery thereof) (kg, V2O5 kg).
  • 2620.99.75.60 Other materials containing silver (Au g).
  • 2620.99.75.80 Other materials containing gold (Au g).
  • 2620.99.75.90 Other materials that do not contain vanadium, silver or gold (kg).
  • 2620.99.85.00 Other (under: Other) (kg): General Free; Special none; Column 2 30%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.