HTS Heading 2704

Coke and semicoke of coal, of lignite or of peat, whether or not agglomerated; retort carbon

All 3 HTS codes under heading 2704 (coke and semicoke of coal, of lignite or of peat), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 2704

  • 2704.00.00 Coke and semicoke of coal, of lignite or of peat, whether or not agglomerated; retort carbon: General Free; Special none; Column 2 Free.
  • 2704.00.00.11 Coke larger than 100 mm (4 inches) in maximum diameter and at least 50 percent of which is retained on a 100-mm (4-inch) sieve after drop shatter testing pursuant to ASTM D 3038, of a kind used in foundries (t).
  • 2704.00.00.25 Other (under: Coke and semicoke of coal) (t).
  • 2704.00.00.50 Other (under: Coke and semicoke of coal, of lignite or of peat, whether or not agglomerated; retort carbon) (t).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.