HTS Chapter 27
Mineral fuels, mineral oils and products of their distillation; bituminous substances; mineral waxes
The 16 headings and 141 HTS codes of chapter 27 (fuels and mineral oils), with their duty rates from the 2026 HTS Revision 23.
The 16 headings of chapter 27
- 2701: Coal; briquettes, ovoids and similar solid fuels manufactured from coal (6 codes, General duty Free)
- 2702: Lignite, whether or not agglomerated, excluding jet (2 codes, General duty Free)
- 2703: Peat (including peat litter), whether or not agglomerated (1 code, General duty Free)
- 2704: Coke and semicoke of coal, of lignite or of peat, whether or not agglomerated; retort carbon (3 codes, General duty Free)
- 2705: Coal gas, water gas, producer gas and similar gases, other than petroleum gases and other gaseous hydrocarbons (1 code, General duty Free)
- 2706: Tar distilled from coal, from lignite or from peat, and other mineral tars, whether or not dehydrated or partially distilled, including reconstituted tars (1 code, General duty Free)
- 2707: Oils and other products of the distillation of high temperature coal tar; similar products in which the weight of the aromatic constituents exceeds that of the nonaromatic constituents (17 codes, General duty Free to 12.5%, some per unit)
- 2708: Pitch and pitch coke, obtained from coal tar or from other mineral tars (2 codes, General duty Free)
- 2709: Petroleum oils and oils obtained from bituminous minerals, crude (3 codes, General duty Free, some per unit)
- 2710: Petroleum oils and oils obtained from bituminous minerals, other than crude; preparations not elsewhere specified or included, containing by weight 70 percent or more of petroleum oils or of oils obtained from bituminous minerals, these oils being the basic constituents of the preparations; waste oils (76 codes, General duty Free to 7%, some per unit)
- 2711: Petroleum gases and other gaseous hydrocarbons (17 codes, General duty Free)
- 2712: Petroleum jelly; paraffin wax, microcrystalline petroleum wax, slack wax, ozokerite, lignite wax, peat wax, other mineral waxes and similar products obtained by synthesis or by other processes, whether or not colored (4 codes, General duty Free)
- 2713: Petroleum coke, petroleum bitumen and other residues of petroleum oils or of oils obtained from bituminous minerals (4 codes, General duty Free)
- 2714: Bitumen and asphalt, natural; bituminous or oil shale and tar sands; asphaltites and asphaltic rocks (2 codes, General duty Free)
- 2715: Bituminous mixtures based on natural asphalt, on natural bitumen, on petroleum bitumen, on mineral tar or on mineral tar pitch (for example, bituminous mastics, cut-backs) (1 code, General duty Free)
- 2716: Electrical energy (1 code, General duty Free)
Where it sits in the schedule
Chapter 27 is in Section V of the Harmonized System, mineral products (chapters 25 to 27). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.
Last reviewed 2026-11-12.