HTS Heading 2803

Carbon (carbon blacks and other forms of carbon not elsewhere specified or included)

All 2 HTS codes under heading 2803 (carbon), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 2803

  • 2803.00.00 Carbon (carbon blacks and other forms of carbon not elsewhere specified or included): General Free; Special none; Column 2 20%.
  • 2803.00.00.10 Carbon black (under: Carbon (carbon blacks and other forms of carbon not elsewhere specified or included)) (kg).
  • 2803.00.00.50 Other (under: Carbon (carbon blacks and other forms of carbon not elsewhere specified or included)) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.