HTS Heading 2804

Hydrogen, rare gases and other nonmetals

All 16 HTS codes under heading 2804 (hydrogen, rare gases and other nonmetals), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5.5%.

Every line of heading 2804

  • 2804 Hydrogen, rare gases and other nonmetals.
  • 2804.10.00.00 Hydrogen (under: Hydrogen, rare gases and other nonmetals) (thousand m3): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2804.21.00.00 Argon (under: Rare gases) (thousand m3): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2804.29.00 Other (under: Rare gases): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2804.29.00.10 Helium (under: Other) (thousand m3).
  • 2804.29.00.20 Neon (under: Other) (thousand m3).
  • 2804.29.00.30 Isotopically pure rare gases having a purity of 99 percent or more by volume (thousand m3).
  • 2804.29.00.55 Other (under: Other) (thousand m3).
  • 2804.30.00.00 Nitrogen (under: Hydrogen, rare gases and other nonmetals) (thousand m3): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2804.40.00.00 Oxygen (under: Hydrogen, rare gases and other nonmetals) (thousand m3): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2804.50.00 Boron; tellurium (under: Hydrogen, rare gases and other nonmetals): General Free; Special none; Column 2 25%.
  • 2804.50.00.10 Boron (under: Boron; tellurium) (kg).
  • 2804.50.00.20 Tellurium (under: Boron; tellurium) (kg).
  • 2804.61.00.00 Containing by weight not less than 99.99 percent of silicon (kg): General Free; Special none; Column 2 25%.
  • 2804.69 Other (under: Silicon).
  • 2804.69.10.00 Containing by weight less than 99.99 percent but not less than 99 percent of silicon (kg, Si kg): General 5.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 21%.
  • 2804.69.50.00 Other (under: Other) (kg, Si kg): General 5.5%; Special Free (A+,AU,BH,CL,CO,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 45%.
  • 2804.70.00.00 Phosphorus (under: Hydrogen, rare gases and other nonmetals) (kg): General Free; Special none; Column 2 17.6¢/kg.
  • 2804.80.00.00 Arsenic (under: Hydrogen, rare gases and other nonmetals) (kg): General Free; Special none; Column 2 13.2¢/kg.
  • 2804.90.00.00 Selenium (under: Hydrogen, rare gases and other nonmetals) (kg): General Free; Special none; Column 2 Free.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.