HTS Heading 2812

Halides and halide oxides of nonmetals

All 11 HTS codes under heading 2812 (halides and halide oxides of nonmetals), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.7%.

Every line of heading 2812

  • 2812 Halides and halide oxides of nonmetals.
  • 2812.11.00.00 Carbonyl dichloride (phosgene) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2812.12.00.00 Phosphorous oxychloride (under: Chlorides and chloride oxides) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2812.13.00.00 Phosphorous trichloride (under: Chlorides and chloride oxides) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2812.14.00.00 Phosphorous pentachloride (under: Chlorides and chloride oxides) (kg): General Free; Special none; Column 2 25%.
  • 2812.15.00.00 Sulfur monochloride (under: Chlorides and chloride oxides) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2812.16.00.00 Sulfur dichloride (under: Chlorides and chloride oxides) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2812.17.00.00 Thionyl chloride (under: Chlorides and chloride oxides) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2812.19.00 Other (under: Chlorides and chloride oxides): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2812.19.00.10 Arsenic trichloride (under: Other) (kg).
  • 2812.19.00.90 Other (under: Other) (kg).
  • 2812.90.00 Other (under: Halides and halide oxides of nonmetals): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2812.90.00.10 Sulfur hexafluoride (under: Other) (kg).
  • 2812.90.00.90 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.