HTS Heading 2813
Sulfides of nonmetals; commercial phosphorus trisulfide
All 4 HTS codes under heading 2813 (sulfides of nonmetals), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.7%.
Every line of heading 2813
- 2813 Sulfides of nonmetals; commercial phosphorus trisulfide.
- 2813.10.00.00 Carbon disulfide (under: Sulfides of nonmetals; commercial phosphorus trisulfide) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 2813.90 Other (under: Sulfides of nonmetals; commercial phosphorus trisulfide).
- 2813.90.10.00 Of arsenic (under: Other) (kg): General Free; Special none; Column 2 Free.
- 2813.90.20.00 Of phosphorus (under: Other) (kg): General Free; Special none; Column 2 25%.
- 2813.90.50.00 Other (under: Other) (kg): General 3.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.