HTS Heading 2817

Zinc oxide; zinc peroxide

The HTS code under heading 2817 (zinc oxide), with its duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 2817

  • 2817.00.00.00 Zinc oxide; zinc peroxide (kg): General Free; Special none; Column 2 5.5%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.