HTS Heading 2816
Hydroxide and peroxide of magnesium; oxides, hydroxides and peroxides, of strontium or barium
All 3 HTS codes under heading 2816 (hydroxide and peroxide of magnesium), with their duty rates from the 2026 HTS Revision 23. General duty 2% to 4.2%.
Every line of heading 2816
- 2816 Hydroxide and peroxide of magnesium; oxides, hydroxides and peroxides, of strontium or barium.
- 2816.10.00.00 Hydroxide and peroxide of magnesium (kg): General 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 2816.40 Oxides, hydroxides and peroxides, of strontium or barium.
- 2816.40.10.00 Of strontium (under: Oxides, hydroxides and peroxides, of strontium or barium) (kg): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 2816.40.20.00 Of barium (under: Oxides, hydroxides and peroxides, of strontium or barium) (kg): General 2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10.5%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.