HTS Heading 2821

Iron oxides and hydroxides; earth colors containing 70 percent or more by weight of combined iron evaluated as Fe2O3

All 6 HTS codes under heading 2821 (iron oxides and hydroxides), with their duty rates from the 2026 HTS Revision 23. General duty 3.7% to 5.5%.

Every line of heading 2821

  • 2821 Iron oxides and hydroxides; earth colors containing 70 percent or more by weight of combined iron evaluated as Fe2O3.
  • 2821.10.00 Iron oxides and hydroxides (under: Iron oxides and hydroxides; earth colors containing 70 percent or more by weight of combined iron evaluated as Fe2O3): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2821.10.00.10 Black (under: Synthetic pigments) (kg).
  • 2821.10.00.20 Red (under: Synthetic pigments) (kg).
  • 2821.10.00.30 Yellow (under: Synthetic pigments) (kg).
  • 2821.10.00.40 Other (under: Synthetic pigments) (kg).
  • 2821.10.00.50 Other (under: Iron oxides and hydroxides) (kg).
  • 2821.20.00.00 Earth colors (under: Iron oxides and hydroxides; earth colors containing 70 percent or more by weight of combined iron evaluated as Fe2O3) (kg): General 5.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.