HTS Heading 2822
Cobalt oxides and hydroxides; commercial cobalt oxides
All 2 HTS codes under heading 2822 (cobalt oxides and hydroxides), with their duty rates from the 2026 HTS Revision 23. General duty 0.1%.
Every line of heading 2822
- 2822.00.00 Cobalt oxides and hydroxides; commercial cobalt oxides: General 0.1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 1.7%.
- 2822.00.00.10 Cobalt(II, III) oxide (cobalt tetroxide) (kg).
- 2822.00.00.90 Other (under: Cobalt oxides and hydroxides; commercial cobalt oxides) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.