HTS Heading 2826
Fluorides; fluorosilicates, fluoroaluminates and other complex fluorine salts
All 8 HTS codes under heading 2826 (fluorides), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.1%.
Every line of heading 2826
- 2826 Fluorides; fluorosilicates, fluoroaluminates and other complex fluorine salts.
- 2826.12.00.00 Of aluminum (under: Fluorides) (kg): General Free; Special none; Column 2 25%.
- 2826.19 Other (under: Fluorides).
- 2826.19.10.00 Of ammonium (under: Other) (kg): General 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 2826.19.20.00 Of sodium (under: Other) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 2826.19.90.00 Other (under: Other) (kg): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 2826.30.00.00 Sodium hexafluoroaluminate (Synthetic cryolite) (t): General Free; Special none; Column 2 Free.
- 2826.90 Other (under: Fluorides; fluorosilicates, fluoroaluminates and other complex fluorine salts).
- 2826.90.10.00 Fluorosilicates of sodium or of potassium (kg): General 4.1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 62.5%.
- 2826.90.90 Other (under: Other): General 3.1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 2826.90.90.10 Lithium hexafluorophosphate (under: Other) (kg).
- 2826.90.90.90 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.