HTS Heading 2827

Chlorides, chloride oxides and chloride hydroxides; bromides and bromide oxides; iodides and iodide oxides

All 24 HTS codes under heading 2827 (chlorides), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5.5%.

Every line of heading 2827

  • 2827 Chlorides, chloride oxides and chloride hydroxides; bromides and bromide oxides; iodides and iodide oxides.
  • 2827.10.00.00 Ammonium chloride (under: Chlorides, chloride oxides and chloride hydroxides; bromides and bromide oxides; iodides and iodide oxides) (kg): General 2.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 18%.
  • 2827.20.00.00 Calcium chloride (under: Chlorides, chloride oxides and chloride hydroxides; bromides and bromide oxides; iodides and iodide oxides) (kg): General Free; Special none; Column 2 Free.
  • 2827.31.00.00 Of magnesium (under: Other chlorides) (kg): General 1.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 5%.
  • 2827.32.00.00 Of aluminum (under: Other chlorides) (kg): General Free; Special none; Column 2 25%.
  • 2827.35.00.00 Of nickel (under: Other chlorides) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2827.39 Other (under: Other chlorides).
  • 2827.39.10.00 Of vanadium (under: Other) (kg, V kg): General 5.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 2827.39.25.00 Of tin (under: Other) (kg): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2827.39.30.00 Of titanium (under: Other) (kg): General 4.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 2827.39.40.00 Of tungsten (under: Other) (kg, W kg): General 5.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P, PA,PE,S,SG); Column 2 45.5%.
  • 2827.39.45.00 Of barium (under: Other) (kg): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 28.5%.
  • 2827.39.55.00 Of iron (under: Other) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2827.39.60.00 Of cobalt (under: Other) (kg): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 2827.39.65.00 Of zinc (under: Other) (kg): General 1.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 5%.
  • 2827.39.90 Other (under: Other): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2827.39.90.10 Of lithium (under: Other) (kg).
  • 2827.39.90.50 Other (under: Other) (kg).
  • 2827.41.00.00 Of copper (under: Chloride oxides and chloride hydroxides) (kg): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 32.5%.
  • 2827.49 Other (under: Chloride oxides and chloride hydroxides).
  • 2827.49.10.00 Of vanadium (under: Other) (kg, V kg): General 5.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 2827.49.50.00 Other (under: Other) (kg): General 5.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2827.51.00.00 Bromides of sodium or of potassium (kg): General Free; Special none; Column 2 22¢/kg.
  • 2827.59 Other (under: Bromides and bromide oxides).
  • 2827.59.25.00 Of ammonium, of calcium or of zinc (kg): General Free; Special none; Column 2 25%.
  • 2827.59.51.00 Other (under: Other) (kg): General 3.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2827.60 Iodides and iodide oxides (under: Chlorides, chloride oxides and chloride hydroxides; bromides and bromide oxides; iodides and iodide oxides).
  • 2827.60.10.00 Of calcium or of copper (under: Iodides and iodide oxides) (kg): General Free; Special none; Column 2 25%.
  • 2827.60.20.00 Of potassium (under: Iodides and iodide oxides) (kg): General 2.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 7.5%.
  • 2827.60.51.00 Other (under: Iodides and iodide oxides) (kg): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.