HTS Heading 2829

Chlorates and perchlorates; bromates and perbromates; iodates and periodates

All 6 HTS codes under heading 2829 (chlorates and perchlorates), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.7%.

Every line of heading 2829

  • 2829 Chlorates and perchlorates; bromates and perbromates; iodates and periodates.
  • 2829.11.00.00 Of sodium (under: Chlorates) (kg): General Free; Special none; Column 2 13%.
  • 2829.19.01.00 Other (under: Chlorates) (kg): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2829.90 Other (under: Chlorates and perchlorates; bromates and perbromates; iodates and periodates).
  • 2829.90.05.00 Potassium bromate (under: Other) (kg): General Free; Special none; Column 2 25%.
  • 2829.90.25.00 Sodium bromate (under: Other) (kg): General Free; Special none; Column 2 25%.
  • 2829.90.40.00 Of potassium (under: Other) (kg): General 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2829.90.61.00 Other (under: Other) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.