HTS Heading 2830
Sulfides; polysulfides, whether or not chemically defined
All 5 HTS codes under heading 2830 (sulfides), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.7%.
Every line of heading 2830
- 2830 Sulfides; polysulfides, whether or not chemically defined.
- 2830.10.00.00 Sodium sulfides (under: Sulfides; polysulfides, whether or not chemically defined) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 2830.90 Other (under: Sulfides; polysulfides, whether or not chemically defined).
- 2830.90.10.00 Zinc sulfide, luminescent grade having a purity of 99.99 percent or more by weight (kg): General Free; Special none; Column 2 11%.
- 2830.90.15.00 Other zinc sulfide (under: Other) (kg): General 2.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 11%.
- 2830.90.20.00 Cadmium sulfide (under: Other) (kg): General 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 2830.90.90.00 Other (under: Other) (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.