HTS Heading 2837

Cyanides, cyanide oxides and complex cyanides

All 6 HTS codes under heading 2837 (cyanides), with their duty rates from the 2026 HTS Revision 23. General duty Free to 1.7%.

Every line of heading 2837

  • 2837 Cyanides, cyanide oxides and complex cyanides.
  • 2837.11.00.00 Of sodium (under: Cyanides and cyanide oxides) (kg): General Free; Special none; Column 2 Free.
  • 2837.19.01 Other (under: Cyanides and cyanide oxides): General Free; Special none; Column 2 Free.
  • 2837.19.01.10 Potassium cyanide (under: Other) (kg).
  • 2837.19.01.15 Calcium cyanide (under: Other) (kg).
  • 2837.19.01.25 Other (under: Other) (kg).
  • 2837.20 Complex cyanides (under: Cyanides, cyanide oxides and complex cyanides).
  • 2837.20.10.00 Potassium ferricyanide (under: Complex cyanides) (kg): General 1.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 5.1%.
  • 2837.20.51.00 Other (under: Complex cyanides) (kg): General 1.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 8.5%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.