HTS Heading 2839
Silicates; commercial alkali metal silicates
All 4 HTS codes under heading 2839 (silicates), with their duty rates from the 2026 HTS Revision 23. General duty 1.1% to 3.1%.
Every line of heading 2839
- 2839 Silicates; commercial alkali metal silicates.
- 2839.11.00.00 Sodium metasilicates (under: Of sodium) (kg): General 1.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 3%.
- 2839.19.00.00 Other (under: Of sodium) (kg): General 1.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 3%.
- 2839.90 Other (under: Silicates; commercial alkali metal silicates).
- 2839.90.10.00 Of potassium (under: Other) (kg): General 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 2839.90.50.00 Other (under: Other) (kg): General 3.1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.