HTS Heading 2840
Borates; peroxoborates (perborates)
All 5 HTS codes under heading 2840 (borates), with their duty rates from the 2026 HTS Revision 23. General duty 0.1% to 3.7%.
Every line of heading 2840
- 2840 Borates; peroxoborates (perborates).
- 2840.11.00.00 Anhydrous (under: Disodium tetraborate (refined borax)) (kg): General 0.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 1.2%.
- 2840.19.00.00 Other (under: Disodium tetraborate (refined borax)) (kg): General 0.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 0.4%.
- 2840.20.00.00 Other borates (under: Borates; peroxoborates (perborates)) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 2840.30.00 Peroxoborates (perborates) (under: Borates; peroxoborates (perborates)): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 2840.30.00.10 Sodium perborate (under: Peroxoborates (perborates)) (kg).
- 2840.30.00.50 Other (under: Peroxoborates (perborates)) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.