HTS Heading 2844
Radioactive chemical elements and radioactive isotopes (including the fissile or fertile chemical elements and isotopes) and their compounds; mixtures and residues containing these products
All 23 HTS codes under heading 2844 (radioactive chemical elements), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5.5%.
Every line of heading 2844
- 2844 Radioactive chemical elements and radioactive isotopes (including the fissile or fertile chemical elements and isotopes) and their compounds; mixtures and residues containing these products.
- 2844.10 Natural uranium and its compounds; alloys, dispersions (including cermets), ceramic products and mixtures containing natural uranium or natural uranium compounds.
- 2844.10.10.00 Uranium metal (under: Natural uranium and its compounds; alloys, dispersions (including cermets), ceramic products and mixtures containing natural uranium or natural uranium compounds) (kg): General 5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 2844.10.20 Uranium compounds (under: Natural uranium and its compounds; alloys, dispersions (including cermets), ceramic products and mixtures containing natural uranium or natural uranium compounds): General Free; Special none; Column 2 Free.
- 2844.10.20.10 Oxide (under: Uranium compounds) (kg).
- 2844.10.20.25 Hexafluoride (under: Uranium compounds) (kg).
- 2844.10.20.55 Other (under: Uranium compounds) (kg).
- 2844.10.50.00 Other (under: Natural uranium and its compounds; alloys, dispersions (including cermets), ceramic products and mixtures containing natural uranium or natural uranium compounds) (kg): General 5%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P, PA,PE,S,SG); Column 2 45%.
- 2844.20.00 Uranium enriched in U235 and its compounds; plutonium and its compounds; alloys, dispersions (including cermets), ceramic products and mixtures containing uranium enriched in U235, plutonium or compounds of these products: General Free; Special none; Column 2 Free.
- 2844.20.00.10 Oxide (under: Uranium compounds) (kg).
- 2844.20.00.20 Fluorides (under: Uranium compounds) (kg).
- 2844.20.00.30 Other (under: Uranium compounds) (kg).
- 2844.20.00.50 Other (under: Uranium enriched in U235 and its compounds; plutonium and its compounds; alloys, dispersions (including cermets), ceramic products and mixtures containing uranium enriched in U235, plutonium or compounds of these products) (kg).
- 2844.30 Uranium depleted in U235 and its compounds; thorium and its compounds; alloys, dispersions (including cermets), ceramic products and mixtures containing uranium depleted in U235, thorium, or compounds of these products.
- 2844.30.10.00 Thorium compounds (under: Uranium depleted in U235 and its compounds; thorium and its compounds; alloys, dispersions (including cermets), ceramic products and mixtures containing uranium depleted in U235, thorium, or compounds of these products) (kg): General 5.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 2844.30.20 Uranium compounds (under: Uranium depleted in U235 and its compounds; thorium and its compounds; alloys, dispersions (including cermets), ceramic products and mixtures containing uranium depleted in U235, thorium, or compounds of these products): General Free; Special none; Column 2 Free.
- 2844.30.20.10 Oxide (under: Uranium compounds) (kg).
- 2844.30.20.20 Fluorides (under: Uranium compounds) (kg).
- 2844.30.20.50 Other (under: Uranium compounds) (kg).
- 2844.30.50 Other (under: Uranium depleted in U235 and its compounds; thorium and its compounds; alloys, dispersions (including cermets), ceramic products and mixtures containing uranium depleted in U235, thorium, or compounds of these products): General 5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 2844.30.50.10 Uranium metal (under: Other) (kg).
- 2844.30.50.50 Other (under: Other) (kg).
- 2844.41.00.00 Tritium and its compounds; alloys, dispersions (including cermets), ceramic products and mixtures containing tritium or its compounds (kg): General Free; Special none; Column 2 Free.
- 2844.42.00.00 Actinium-225, actinium-227, californium-253, curium-240, curium-241, curium-242, curium-243, curium-244, einsteinium-253, einsteinium-254, gadolinium-148, polonium-208, polonium-209, polonium-210, radium-223, uranium-230 or uranium-232, and their compounds; alloys, dispersions (including cermets), ceramic products and mixtures containing these elements or compounds (GBq): General Free; Special none; Column 2 Free.
- 2844.43.00 Other radioactive elements and isotopes and compounds; other alloys, dispersions (including cermets), ceramic products and mixtures containing these elements, isotopes or compounds: General Free; Special none; Column 2 Free.
- 2844.43.00.10 Elements, isotopes and compounds with cobalt-60 radioactivity only (GBq).
- 2844.43.00.21 Americium-241, californium-252, cesium-137, gadolinium-153, idium-192, promethium-147, radium-226, selenium-75, or ytterbium-169 (GBq).
- 2844.43.00.28 Other (under: Other elements, isotopes and compounds) (GBq).
- 2844.43.00.50 Other (under: Other radioactive elements and isotopes and compounds; other alloys, dispersions (including cermets), ceramic products and mixtures containing these elements, isotopes or compounds) (kg).
- 2844.44.00.00 Radioactive residues (under: Radioactive elements and isotopes and compounds other than those of subheading 2844.10, 2844.20 or 2844.30; alloys, dispersions (including cermets), ceramic products and mixtures containing these elements, isotopes or compounds; radioactive residues) (kg): General Free; Special none; Column 2 Free.
- 2844.50.00.00 Spent (irradiated) fuel elements (cartridges) of nuclear reactors (kg): General Free; Special none; Column 2 Free.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.