HTS Heading 2845
Isotopes other than those of heading 2844; compounds, inorganic or organic, of such isotopes, whether or not chemically defined
All 5 HTS codes under heading 2845 (isotopes other than those of heading 2844), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 2845
- 2845 Isotopes other than those of heading 2844; compounds, inorganic or organic, of such isotopes, whether or not chemically defined.
- 2845.10.00.00 Heavy water (Deuterium oxide) (kg): General Free; Special none; Column 2 25%.
- 2845.20.00.00 Boron enriched in boron-10 and its compounds (kg): General Free; Special none; Column 2 25%.
- 2845.30.00.00 Lithium enriched in lithium-6 and its compounds (kg): General Free; Special none; Column 2 25%.
- 2845.40.00.00 Helium-3 (under: Isotopes other than those of heading 2844; compounds, inorganic or organic, of such isotopes, whether or not chemically defined) (kg): General Free; Special none; Column 2 25%.
- 2845.90.01.00 Other (under: Isotopes other than those of heading 2844; compounds, inorganic or organic, of such isotopes, whether or not chemically defined) (kg): General Free; Special none; Column 2 25%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.