HTS Heading 2846

Compounds, inorganic or organic, of rare-earth metals, of yttrium or of scandium, or of mixtures of these metals

All 11 HTS codes under heading 2846 (compounds, inorganic or organic), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5.5%.

Every line of heading 2846

  • 2846 Compounds, inorganic or organic, of rare-earth metals, of yttrium or of scandium, or of mixtures of these metals.
  • 2846.10.00 Cerium compounds (under: Compounds, inorganic or organic, of rare-earth metals, of yttrium or of scandium, or of mixtures of these metals): General 5.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2846.10.00.10 Cerium oxides (under: Cerium compounds) (kg).
  • 2846.10.00.50 Other (under: Cerium compounds) (kg).
  • 2846.90 Other (under: Compounds, inorganic or organic, of rare-earth metals, of yttrium or of scandium, or of mixtures of these metals).
  • 2846.90.20 Mixtures of rare-earth oxides or of rare-earth chlorides: General Free; Special none; Column 2 25%.
  • 2846.90.20.05 Containing lanthanum as the predominant metal (kg).
  • 2846.90.20.15 Containing yttrium or scandium as the predominant metal (kg).
  • 2846.90.20.40 Other (under: Rare-earth oxides except cerium oxides) (kg).
  • 2846.90.20.82 Containing yttrium or scandium as the predominant metal (kg).
  • 2846.90.20.84 Other (under: Rare-earth chlorides except cerium chlorides) (kg).
  • 2846.90.40.00 Yttrium bearing materials and compounds containing by weight more than 19 percent but less than 85 percent yttrium oxide equivalent (kg): General Free; Special none; Column 2 25%.
  • 2846.90.80 Other (under: Other): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2846.90.80.70 Containing lanthanum as the predominant metal (kg).
  • 2846.90.80.75 Other (under: Mixtures of rare-earth carbonates other than of cerium carbonate) (kg).
  • 2846.90.80.90 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.