HTS Heading 2852
Inorganic or organic compounds of mercury, whether or not chemically defined, excluding amalgams
All 4 HTS codes under heading 2852 (inorganic or organic compounds of mercury), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3%.
Every line of heading 2852
- 2852 Inorganic or organic compounds of mercury, whether or not chemically defined, excluding amalgams.
- 2852.10 Chemically defined (under: Inorganic or organic compounds of mercury, whether or not chemically defined, excluding amalgams).
- 2852.10.10.00 Mercuric oxide, mercuric cyanide, mercuric oxycyanide and mercuric potassium cyanide (kg): General Free; Special none; Column 2 25%.
- 2852.10.90.00 Other (under: Chemically defined) (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 2852.90 Other (under: Inorganic or organic compounds of mercury, whether or not chemically defined, excluding amalgams).
- 2852.90.05.00 Albuminates, tannates and phosphides of mercury (kg): General Free; Special none; Column 2 25%.
- 2852.90.90.00 Other (under: Other) (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.