HTS Heading 2853

Phosphides, whether or not chemically defined, excluding ferrophosphorous; other inorganic compounds (including distilled or conductivity water and water of similar purity); liquid air (whether or not rare gases have been removed); compressed air; amalgams, other than amalgams of precious metals

All 5 HTS codes under heading 2853 (phosphides), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.8%.

Every line of heading 2853

  • 2853 Phosphides, whether or not chemically defined, excluding ferrophosphorous; other inorganic compounds (including distilled or conductivity water and water of similar purity); liquid air (whether or not rare gases have been removed); compressed air; amalgams, other than amalgams of precious metals.
  • 2853.10.00.00 Cyanogen chloride (chloorcyan) (kg): General 2.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2853.90 Other (under: Phosphides, whether or not chemically defined, excluding ferrophosphorous; other inorganic compounds (including distilled or conductivity water and water of similar purity); liquid air (whether or not rare gases have been removed); compressed air; amalgams, other than amalgams of precious metals).
  • 2853.90.10.00 Of copper (phosphor copper), containing more than 15 percent by weight of phosphorous (kg): General 2.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 32.5%.
  • 2853.90.50.00 Of other metals or nonmetals (under: Phosphides, whether or not chemically defined, excluding ferrophosphorous) (kg): General Free; Special none; Column 2 25%.
  • 2853.90.90 Other (under: Other): General 2.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2853.90.90.10 Gallium arsenide wafers, undoped (kg).
  • 2853.90.90.90 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.