HTS Heading 2926

Nitrile-function compounds

All 22 HTS codes under heading 2926 (nitrile-function compounds), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.5%.

Every line of heading 2926

  • 2926 Nitrile-function compounds.
  • 2926.10.00.00 Acrylonitrile (under: Nitrile-function compounds) (kg): General 6.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 56.5%.
  • 2926.20.00.00 1-Cyanoguanidine (Dicyandiamide) (kg): General Free; Special none; Column 2 25%.
  • 2926.30 Fenproporex (INN) and its salts; Methadone (INN) intermediate (4-cyano-2-dimethylamino-4,4- diphenylbutane).
  • 2926.30.10.00 Fenproporex (INN) and its salts (kg): General Free; Special none; Column 2 15.4¢/kg + 65.5%.
  • 2926.30.20.00 4-Cyano-2-dimethylamino-4,4-diphenylbutane (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 65.5%.
  • 2926.40.00.00 alpha-Phenylacetoacetonitrile (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO,K,KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 65.5%.
  • 2926.90 Other (under: Nitrile-function compounds).
  • 2926.90.01.00 2-Cyano-4-nitroaniline (under: Aromatic) (kg): General Free; Special none; Column 2 15.4¢/kg + 41%.
  • 2926.90.05.00 2-Amino-4-chlorobenzonitrile (5-Chloro-2- cyanoaniline); 2-Amino-5-chlorobenzonitrile; 4-Amino-2-chlorobenzonitrile; (Cyanoethyl)(hydroxyethyl)-m-toluidine;p-Cyanophenyl acetate; Phthalonitrile; and Tetrachloro-3-cyanobenzoic acid, methyl ester (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 41%.
  • 2926.90.08.00 Benzonitrile (under: Aromatic) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 41%.
  • 2926.90.11.00 2,6-Dichlorobenzonitrile (under: Dichlorobenzonitriles) (kg): General Free; Special none; Column 2 15.4¢/kg + 41%.
  • 2926.90.12.00 Other (under: Dichlorobenzonitriles) (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 41%.
  • 2926.90.14.00 p-Chlorobenzonitrile; and Verapamil hydrochloride (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 65.5%.
  • 2926.90.16.00 [1α(S*),3α(Z)]-(±)-Cyano(3-phenoxyphenyl)- methyl 3-(2-chloro-3,3,3-trifluoro-1-propenyl)- 2,2-dimethylcyclopropanecarboxylate (kg): General Free; Special none; Column 2 15.4¢/kg + 64.5%.
  • 2926.90.17.00 o-Chlorobenzonitrile (under: Aromatic) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 65.5%.
  • 2926.90.19.00 N,N-Bis(2-cyanoethyl) aniline; and 2,6-Difluorobenzonitrile (kg): General Free; Special none; Column 2 15.4¢/kg + 65.5%.
  • 2926.90.21.00 Fungicides (under: Pesticides) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 40%.
  • 2926.90.23.00 3,5-Dibromo-4-hydroxybenzonitrile (Bromoxynil) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 40.5%.
  • 2926.90.25.00 Other (under: Herbicides) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 48.5%.
  • 2926.90.30.00 Other (under: Pesticides) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 64.5%.
  • 2926.90.43.00 Products described in additional U.S. note 3 to section VI (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO,K, KR,L,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 65.5%.
  • 2926.90.48.01 Other (under: Other) (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO,K, KR,L,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 65.5%.
  • 2926.90.50 Other (under: Other): General Free; Special none; Column 2 25%.
  • 2926.90.50.10 Malononitrile (under: Other) (kg).
  • 2926.90.50.50 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.