HTS Heading 2927

Diazo-, azo- or azoxy-compounds

All 8 HTS codes under heading 2927 (diazo-, azo- or azoxy-compounds), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.5%.

Every line of heading 2927

  • 2927.00 Diazo-, azo- or azoxy-compounds.
  • 2927.00.03.00 4-Aminoazobenzenedisulfonic acid, monosodium salt (kg): General Free; Special none; Column 2 15.4¢/kg + 40.5%.
  • 2927.00.06.00 p-Aminoazobenzenedisulfonic acid; and Diazoaminobenzene (1,3-Diphenyltriazene) (kg): General 5.8%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO, KR,L,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 40.5%.
  • 2927.00.15.00 1,1'-Azobisformamide (under: Diazo-, azo- or azoxy-compounds) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2927.00.18.00 1-Naphthalenesulfonic acid, 6-diazo-5,6-dihydro-5-oxo, ester with phenyl(2,3,4-trihydroxyphenyl)methanone; 1-Naphthalenesulfonic acid, 3-diazo-3,4-dihydro-4- oxo-ar'-(1-methylethyl) [1,1'-biphenyl]-4-yl ester; 1-Napthanlenesulfonic acid, 6-diazo-5,6-dihydro-5- oxo-,(octahydro-4,7-methano-1H-indene-2,5-diyl) bis- (methylene) ester; and 1-Naphthalenesulfonic acid, 6-diazo-5,6-dihydro-5- oxo-, 4-benzoyl-1,2,3-benzenetriyl ester (kg): General Free; Special none; Column 2 15.4¢/kg + 50%.
  • 2927.00.25.00 Photographic chemicals (under: Other) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 50%.
  • 2927.00.30.00 Fast color bases and fast color salts (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 54.5%.
  • 2927.00.40.00 Products described in additional U.S. note 3 to section VI (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO,K, KR,L,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 63.5%.
  • 2927.00.50.00 Other (under: Other) (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO,K, KR,L,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 63.5%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.