HTS Heading 2935
Sulfonamides
All 19 HTS codes under heading 2935 (sulfonamides), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.5%.
Every line of heading 2935
- 2935 Sulfonamides.
- 2935.10.00.00 N-Methyl perfluorooctane sulfonamide (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL, JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 57.5%.
- 2935.20.00.00 N-Ethyl perfluorooctane sulfonamide (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL, JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 57.5%.
- 2935.30.00.00 N-Ethyl -N-(2-hydroxyethyl)perfluorooctane sulfonamide (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL, JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 57.5%.
- 2935.40.00.00 N-(2-hydroxyethyl)-N-methyl perfluorooctane sulfonamide (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL, JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 57.5%.
- 2935.50.00.00 Other perfluorooctane sulfonamides (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL, JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 57.5%.
- 2935.90 Other (under: Sulfonamides).
- 2935.90.06.00 4-Amino-6-chloro-m-benzenedisulfonamide and Methyl-4-aminobenzenesulfonylcarbamate (Asulam) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 41%.
- 2935.90.10.00 2-Amino-N-ethylbenzenesulfonanilide; 5-Amino-α,α,α-trifluorotoluene-2,4-disulfonamide; Benzenesulfonamide; Benzenesulfonyl hydrazide; 2-Chloro-4-amino-5-hydroxybenzenesulfonamide; 2,5-Dimethoxysulfanilanilide; and Metanilamide (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,L,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 41%.
- 2935.90.13.00 (5‐[2‐Chloro‐4‐ (trifluoromethyl)phenoxy]‐N‐ (methylsulfonyl)‐2‐nitrobenzamide) (Fomesafen); N‐(2,6‐Dichloro‐3‐ methylphenyl)‐5‐ amino‐1,3,4‐triazole‐2‐sulfonamide; 2,4‐Dichloro‐5‐ sulfamoylbenzoic acid; N‐Ethyl‐o‐ toluenesulfonamide; N‐Ethyl‐p‐toluenesulfonamide; 7-(Hexadecylsulfonylamino) ‐1H‐indole; Methyl 5‐{[(4,6‐dimethoxy‐2‐pyrimidinyl)amino]‐ carbonylaminosulfonyl} ‐3‐chloro‐1‐methyl‐1H‐pyrazole‐4‐carboxylate (Halosulfuron methyl); and Mixtures of ortho‐ and para-toluenesulfonamides (kg): General Free; Special none; Column 2 15.4¢/kg + 57.5%.
- 2935.90.15.00 o-Toluenesulfonamide (under: Other) (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL, JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 57.5%.
- 2935.90.20.00 Fast color bases and fast color salts (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 54.5%.
- 2935.90.29.00 Acetylsulfaguanidine (under: Anti-infective agents) (kg): General Free; Special none; Column 2 15.4¢/kg + 96%.
- 2935.90.30.00 Sulfamethazine (under: Anti-infective agents) (kg): General Free; Special none; Column 2 15.4¢/kg + 80%.
- 2935.90.32.00 Acetylsulfisoxazole; Sulfacetamide, sodium; and Sulfamethazine, sodium (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 96%.
- 2935.90.33.00 Sulfathiazole and Sulfathiazole, sodium (kg): General Free; Special none; Column 2 15.4¢/kg + 133%.
- 2935.90.42.00 Salicylazosulfapyridine (Sulfasalazine); Sulfadiazine; Sulfaguanidine; Sulfamerizine; and Sulfapyridine (kg): General Free; Special none; Column 2 15.4¢/kg + 128.5%.
- 2935.90.48.00 Other (under: Anti-infective agents) (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO,K, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 96%.
- 2935.90.60.00 Other (under: Drugs) (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL, JO,K, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 45%.
- 2935.90.75.00 Products described in additional U.S. note 3 to section VI (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO,K, KR,L,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 57.5%.
- 2935.90.95.00 Other (under: Other) (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO,K, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 57.5%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.