HTS Heading 2936

Provitamins and vitamins, natural or reproduced by synthesis (including natural concentrates), derivatives thereof used primarily as vitamins, and intermixtures of the foregoing, whether or not in any solvent

All 18 HTS codes under heading 2936 (provitamins and vitamins), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 2936

  • 2936 Provitamins and vitamins, natural or reproduced by synthesis (including natural concentrates), derivatives thereof used primarily as vitamins, and intermixtures of the foregoing, whether or not in any solvent.
  • 2936.21.00.00 Vitamins A and their derivatives (kg): General Free; Special none; Column 2 25%.
  • 2936.22.00.00 Vitamin B1 (Thiamine) and its derivatives (kg): General Free; Special none; Column 2 25%.
  • 2936.23.00.00 Vitamin B2 (Riboflavin) and its derivatives (kg): General Free; Special none; Column 2 15.4¢/kg + 62%.
  • 2936.24.01.00 D- or DL-Pantothenic acid (Vitamin B5) and its derivatives (kg): General Free; Special none; Column 2 25%.
  • 2936.25.00.00 Vitamin B6 (Pyridoxine and related compounds with Vitamin B6 activity) and its derivatives (kg): General Free; Special none; Column 2 25%.
  • 2936.26.00.00 Vitamin B12 (Cyanocobalamin and related compounds with Vitamin B12 activity) and its derivatives (kg): General Free; Special none; Column 2 15.4¢/kg + 145.5%.
  • 2936.27.00.00 Vitamin C (Ascorbic acid) and its derivatives (kg): General Free; Special none; Column 2 25%.
  • 2936.28.00.00 Vitamin E (Tocopherols and related compounds with Vitamin E activity) and its derivatives (kg): General Free; Special none; Column 2 15.4¢/kg + 63.5%.
  • 2936.29 Other vitamins and their derivatives.
  • 2936.29.10.00 Folic acid (under: Other vitamins and their derivatives) (kg): General Free; Special none; Column 2 15.4¢/kg + 49%.
  • 2936.29.16 Niacin and niacinamide (under: Other vitamins and their derivatives): General Free; Special none; Column 2 25%.
  • 2936.29.16.10 Pharmaceutical grade (under: Niacin) (kg).
  • 2936.29.16.20 Other (under: Niacin) (kg).
  • 2936.29.16.30 Niacinamide (under: Niacin and niacinamide) (kg).
  • 2936.29.20.00 Aromatic or modified aromatic (kg): General Free; Special none; Column 2 15.4¢/kg + 45%.
  • 2936.29.50 Other (under: Other): General Free; Special none; Column 2 25%.
  • 2936.29.50.20 Vitamins D and their derivatives (kg).
  • 2936.29.50.30 Biotin (under: Other) (kg).
  • 2936.29.50.50 Other (under: Other) (kg).
  • 2936.90.01 Other, including provitamins and natural concentrates: General Free; Special none; Column 2 25%.
  • 2936.90.01.10 Provitamins (under: Other, including provitamins and natural concentrates) (kg).
  • 2936.90.01.50 Other (under: Other, including provitamins and natural concentrates) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.