HTS Heading 2939
Alkaloids, natural or reproduced by synthesis, and their salts, ethers, esters and other derivatives
All 24 HTS codes under heading 2939 (alkaloids), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.5%.
Every line of heading 2939
- 2939 Alkaloids, natural or reproduced by synthesis, and their salts, ethers, esters and other derivatives.
- 2939.11.00.00 Concentrates of poppy straw; buprenorphine (INN); codeine, dihydrocodeine (INN), ethylmorphine, etorphine (INN), heroin, hydrocodone (INN), hydromorphone (INN), morphine, nicomorphine (INN), oxycodone (INN), oxymorphone (INN), pholcodine (INN), thebacon (INN) and thebaine; salts thereof (kg): General Free; Special none; Column 2 15.4¢/kg + 50%.
- 2939.19 Other (under: Alkaloids of opium and their derivatives; salts thereof).
- 2939.19.10.00 Papaverine and its salts (under: Other) (kg): General Free; Special none; Column 2 15.4¢/kg + 104%.
- 2939.19.20.00 Synthetic (under: Other) (kg): General Free; Special none; Column 2 15.4¢/kg + 50%.
- 2939.19.50.00 Other (under: Other) (g): General Free; Special none; Column 2 10.6¢/g.
- 2939.20.00 Alkaloids of cinchona and their derivatives; salts thereof: General Free; Special none; Column 2 Free.
- 2939.20.00.10 Quinine and its salts (under: Alkaloids of cinchona and their derivatives; salts thereof) (g).
- 2939.20.00.50 Other (under: Alkaloids of cinchona and their derivatives; salts thereof) (g).
- 2939.30.00.00 Caffeine and its salts (under: Alkaloids, natural or reproduced by synthesis, and their salts, ethers, esters and other derivatives) (kg): General Free; Special none; Column 2 59%.
- 2939.41.00.00 Ephedrine and its salts (under: Alkaloids of ephedra and their derivatives; salts thereof) (kg): General Free; Special none; Column 2 15.4¢/kg + 59%.
- 2939.42.00.00 Pseudoephedrine (INN) and its salts (kg): General Free; Special none; Column 2 15.4¢/kg + 59%.
- 2939.43.00.00 Cathine (INN) and its salts (under: Alkaloids of ephedra and their derivatives; salts thereof) (kg): General Free; Special none; Column 2 15.4¢/kg + 59%.
- 2939.44.00.00 Norephedrine and its salts (under: Alkaloids of ephedra and their derivatives; salts thereof) (kg): General Free; Special none; Column 2 15.4¢/kg + 59%.
- 2939.45.00.00 Levometamfetamine, metamfetamine (INN), metamfetamine racemate and their salts (kg): General Free; Special none; Column 2 25%.
- 2939.49.03.00 Other (under: Alkaloids of ephedra and their derivatives; salts thereof) (kg): General Free; Special none; Column 2 15.4¢/kg + 59%.
- 2939.51.00.00 Fenetylline (INN) and its salts (kg): General Free; Special none; Column 2 25%.
- 2939.59.00.00 Other (under: Theophylline and aminophylline (theophylline- ethylenediamine) and their derivatives; salts thereof) (kg): General Free; Special none; Column 2 25%.
- 2939.61.00.00 Ergometrine and its salts (under: Alkaloids of rye ergot and their derivatives; salts thereof) (kg): General Free; Special none; Column 2 25%.
- 2939.62.00.00 Ergotamine and its salts (under: Alkaloids of rye ergot and their derivatives; salts thereof) (kg): General Free; Special none; Column 2 25%.
- 2939.63.00.00 Lysergic acid and its salts (under: Alkaloids of rye ergot and their derivatives; salts thereof) (kg): General Free; Special none; Column 2 25%.
- 2939.69.00.00 Other (under: Alkaloids of rye ergot and their derivatives; salts thereof) (kg): General Free; Special none; Column 2 25%.
- 2939.72.00.00 Cocaine, ecgonine; salts, esters and other derivatives thereof (kg): General Free; Special none; Column 2 25%.
- 2939.79.00 Other (under: Other, of vegetal origin): General Free; Special none; Column 2 25%.
- 2939.79.00.10 Atropine (INN) and its salts (under: Other) (kg).
- 2939.79.00.90 Other (under: Other) (kg).
- 2939.80.00 Other (under: Alkaloids, natural or reproduced by synthesis, and their salts, ethers, esters and other derivatives): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 30.5%.
- 2939.80.00.10 Saxitoxin (under: Other) (kg).
- 2939.80.00.50 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.