HTS Heading 2938

Glycosides, natural or reproduced by synthesis, and their salts, ethers, esters and other derivatives

All 2 HTS codes under heading 2938 (glycosides), with their duty rates from the 2026 HTS Revision 23. General duty 1.5% to 3.7%.

Every line of heading 2938

  • 2938 Glycosides, natural or reproduced by synthesis, and their salts, ethers, esters and other derivatives.
  • 2938.10.00.00 Rutoside (Rutin) and its derivatives (kg): General 1.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
  • 2938.90.00.00 Other (under: Glycosides, natural or reproduced by synthesis, and their salts, ethers, esters and other derivatives) (kg): General 3.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.