HTS Heading 2942
Other organic compounds
All 5 HTS codes under heading 2942 (other organic compounds), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.5%.
Every line of heading 2942
- 2942.00 Other organic compounds.
- 2942.00.03.00 [2,2'-Thiobis(4-(1,1,3,3-tetramethyl-n-butyl)- phenolato)(2,1)]-O,O',S-(1-butanamine), nickel II (kg): General Free; Special none; Column 2 15.4¢/kg + 46.5%.
- 2942.00.05.00 Drugs (under: Other) (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO,K, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 46%.
- 2942.00.10.00 Products described in additional U.S. note 3 to section VI (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO,K, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 46.5%.
- 2942.00.35.00 Other (under: Other) (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO,K, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 46.5%.
- 2942.00.50.00 Other (under: Other organic compounds) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.