HTS Heading 3001
Glands and other organs for organotherapeutic uses, dried, whether or not powdered; extracts of glands or other organs or of their secretions for organotherapeutic uses; heparin and its salts; other human or animal substances prepared for therapeutic or prophylactic uses, not elsewhere specified or included
All 5 HTS codes under heading 3001 (glands and other organs), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 3001
- 3001 Glands and other organs for organotherapeutic uses, dried, whether or not powdered; extracts of glands or other organs or of their secretions for organotherapeutic uses; heparin and its salts; other human or animal substances prepared for therapeutic or prophylactic uses, not elsewhere specified or included.
- 3001.20.00.00 Extracts of glands or other organs or of their secretions (kg): General Free; Special none; Column 2 10%.
- 3001.90.01 Other (under: Glands and other organs for organotherapeutic uses, dried, whether or not powdered; extracts of glands or other organs or of their secretions for organotherapeutic uses; heparin and its salts; other human or animal substances prepared for therapeutic or prophylactic uses, not elsewhere specified or included): General Free; Special none; Column 2 Free.
- 3001.90.01.10 Liver (under: Glands and other organs, dried, whether or not powdered) (kg).
- 3001.90.01.50 Other (under: Glands and other organs, dried, whether or not powdered) (kg).
- 3001.90.01.65 Heparin (under: Other) (kg).
- 3001.90.01.95 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.