HTS Heading 3006

Pharmaceutical goods specified in note 4 to this chapter

All 14 HTS codes under heading 3006 (pharmaceutical goods), with their duty rates from the 2026 HTS Revision 23. General duty Free to 10.4%, some per unit.

Every line of heading 3006

  • 3006 Pharmaceutical goods specified in note 4 to this chapter.
  • 3006.10.01.00 Sterile surgical catgut, similar sterile suture materials (including sterile absorbable surgical or dental yarns) and sterile tissue adhesives for surgical wound closure; sterile laminaria and sterile laminaria tents; sterile absorbable surgical or dental hemostatics; sterile surgical or dental adhesion barriers, whether or not absorbable (kg): General Free; Special none; Column 2 40%.
  • 3006.30 Opacifying preparations for X-ray examinations; diagnostic reagents designed to be administered to the patient.
  • 3006.30.10.00 Containing antigens or antisera (kg): General Free; Special none; Column 2 Free.
  • 3006.30.50.00 Other (under: Opacifying preparations for X-ray examinations; diagnostic reagents designed to be administered to the patient) (kg): General Free; Special none; Column 2 45%.
  • 3006.40.00.00 Dental cements and other dental fillings; bone reconstruction cements (kg): General Free; Special none; Column 2 20%.
  • 3006.50.00.00 First-aid boxes and kits (under: Pharmaceutical goods specified in note 4 to this chapter) (kg): General Free; Special none; Column 2 45%.
  • 3006.60.00.00 Chemical contraceptive preparations based on hormones, on other products of heading 2937 or on spermicides (kg): General Free; Special none; Column 2 25%.
  • 3006.70.00.00 Gel preparations designed to be used in human or veterinary medicine as a lubricant for parts of the body for surgical operations or physical examinations or as a coupling agent between the body and medical instruments (kg): General 5%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,K,KR,MA,OM, P,PA,PE,S,SG); Column 2 25%.
  • 3006.91.00.00 Appliances identifiable for ostomy use (kg): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 3006.92.00.00 Waste pharmaceuticals (under: Other) (kg): General Free; Special none; Column 2 45%.
  • 3006.93 Placebos and blinded (or double-blinded) clinical trial kits for a recognized clinical trial, put up in measured doses.
  • 3006.93.10.00 Packaged with medicinal preparations (kg): General Free; Special none; Column 2 30%.
  • 3006.93.20.00 Containing over 10 percent by dry weight of sugar (kg): General 40¢/kg + 10.4%; Special Free (BH,CL,JO,KR,OM,SG) See 9822.05.20 (P+) See 9822.06.10 (PE) See 9822.08.01 (CO) See 9822.09.17 (PA) See 9823.10.01-9823.10.45 (S+) See 9822.03.01 (MA); Column 2 47.4¢/kg +12.2%.
  • 3006.93.50.00 Containing ingredients having nutritional value, in which starch or other foodstuff predominates by weight (kg): General 6.4%; Special Free (A, AU, BH, CL, CO, D, E, IL, JO, KR, MA, OM, P,PA, PE, S, SG); Column 2 20%.
  • 3006.93.60.00 In liquid form for oral intake (liters): General 0.2¢/liter; Special Free (A, AU, BH, CL, CO, D, E, IL, JO, KR, MA, OM, P,PA, PE, S, SG); Column 2 4¢/liter.
  • 3006.93.80.00 Placebos and clinical trial kits containing other chemicals other than medicaments (kg): General 5%; Special Free (A+, AU, BH, CL, CO, D, E, IL, JO, JP, K, KR, MA,OM, P, PA, PE, S, SG); Column 2 25%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.