HTS Heading 3005
Wadding, gauze, bandages and similar articles (for example, dressings, adhesive plasters, poultices), impregnated or coated with pharmaceutical substances or put up in forms or packings for retail sale for medical, surgical, dental or veterinary purposes
All 5 HTS codes under heading 3005 (wadding, gauze), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 3005
- 3005 Wadding, gauze, bandages and similar articles (for example, dressings, adhesive plasters, poultices), impregnated or coated with pharmaceutical substances or put up in forms or packings for retail sale for medical, surgical, dental or veterinary purposes.
- 3005.10 Adhesive dressings and other articles having an adhesive layer.
- 3005.10.10.00 Coated or impregnated with pharmaceutical substances (kg): General Free; Special none; Column 2 20%.
- 3005.10.50.00 Other (under: Adhesive dressings and other articles having an adhesive layer) (kg): General Free; Special none; Column 2 40%.
- 3005.90 Other (under: Wadding, gauze, bandages and similar articles (for example, dressings, adhesive plasters, poultices), impregnated or coated with pharmaceutical substances or put up in forms or packings for retail sale for medical, surgical, dental or veterinary purposes).
- 3005.90.10.00 Coated or impregnated with pharmaceutical substances (kg): General Free; Special none; Column 2 20%.
- 3005.90.50 Other (under: Other): General Free; Special none; Column 2 40%.
- 3005.90.50.10 Laparotomy sponges (under: Other) (kg).
- 3005.90.50.90 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.