HTS Heading 3105
Mineral or chemical fertilizers containing two or three of the fertilizing elements nitrogen, phosphorus and potassium; other fertilizers; goods of this chapter in tablets or similar forms or in packages of a gross weight not exceeding 10 kg
All 10 HTS codes under heading 3105 (mineral or chemical fertilizers containing two), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 3105
- 3105 Mineral or chemical fertilizers containing two or three of the fertilizing elements nitrogen, phosphorus and potassium; other fertilizers; goods of this chapter in tablets or similar forms or in packages of a gross weight not exceeding 10 kg.
- 3105.10.00.00 Products of this chapter in tablets or similar forms or in packages of a gross weight not exceeding 10 kg (kg): General Free; Special none; Column 2 Free.
- 3105.20.00.00 Mineral or chemical fertilizers containing the three fertilizing elements nitrogen, phosphorus and potassium (t): General Free; Special none; Column 2 Free.
- 3105.30.00.00 Diammonium hydrogenorthophosphate (Diammonium phosphate) (t): General Free; Special none; Column 2 Free.
- 3105.40.00 Ammonium dihydrogenorthophosphate (Monoammonium phosphate) and mixtures thereof with diammonium hydrogenorthophosphate (Diammonium phosphate): General Free; Special none; Column 2 Free.
- 3105.40.00.10 Ammonium dihydrogenorthophosphate (Monoammonium phosphate) (t).
- 3105.40.00.50 Other (under: Ammonium dihydrogenorthophosphate (Monoammonium phosphate) and mixtures thereof with diammonium hydrogenorthophosphate (Diammonium phosphate)) (t).
- 3105.51.00.00 Containing nitrates and phosphates (t): General Free; Special none; Column 2 Free.
- 3105.59.00.00 Other (under: Other mineral or chemical fertilizers containing the two fertilizing elements nitrogen and phosphorus) (t): General Free; Special none; Column 2 Free.
- 3105.60.00.00 Mineral or chemical fertilizers containing the two fertilizing elements phosphorus and potassium (t): General Free; Special none; Column 2 Free.
- 3105.90.00 Other (under: Mineral or chemical fertilizers containing two or three of the fertilizing elements nitrogen, phosphorus and potassium; other fertilizers; goods of this chapter in tablets or similar forms or in packages of a gross weight not exceeding 10 kg): General Free; Special none; Column 2 Free.
- 3105.90.00.10 Potassium nitrate-sodium nitrate mixtures (t).
- 3105.90.00.50 Other (under: Other) (t).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.