HTS Heading 3201
Tanning extracts of vegetable origin; tannins and their salts, ethers, esters and other derivatives
All 5 HTS codes under heading 3201 (tanning extracts of vegetable origin), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.1%.
Every line of heading 3201
- 3201 Tanning extracts of vegetable origin; tannins and their salts, ethers, esters and other derivatives.
- 3201.10.00.00 Quebracho extract (under: Tanning extracts of vegetable origin; tannins and their salts, ethers, esters and other derivatives) (kg): General Free; Special none; Column 2 Free.
- 3201.20.00.00 Wattle extract (under: Tanning extracts of vegetable origin; tannins and their salts, ethers, esters and other derivatives) (kg): General Free; Special none; Column 2 Free.
- 3201.90 Other (under: Tanning extracts of vegetable origin; tannins and their salts, ethers, esters and other derivatives).
- 3201.90.10.00 Tannic acid, containing by weight 50 percent or more of tannic acid (kg): General 1.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 8%.
- 3201.90.25.00 Extracts of canaigre, chestnut, curupay, divi-divi, eucalyptus, gambier, hemlock, larch, mangrove, myrobalan, oak, sumac, tara, urunday or valonia (kg): General Free; Special none; Column 2 Free.
- 3201.90.50.00 Other (under: Other) (kg): General 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.