HTS Heading 3205

Color lakes; preparations as specified in note 3 to this chapter based on color lakes

All 11 HTS codes under heading 3205 (color lakes), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.5%.

Every line of heading 3205

  • 3205.00 Color lakes; preparations as specified in note 3 to this chapter based on color lakes.
  • 3205.00.05.00 Food coloring solutions, containing cochineal carmine lake and paprika oleo resins, but not including any synthetic organic coloring matter (kg): General Free; Special none; Column 2 72%.
  • 3205.00.15.00 Other (under: Carmine) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 72%.
  • 3205.00.40 Products described in additional U.S. note 3 to section VI: General 6.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 72%.
  • 3205.00.40.10 Yellow (under: Products described in additional U.S. note 3 to section VI) (kg).
  • 3205.00.40.20 Red (under: Products described in additional U.S. note 3 to section VI) (kg).
  • 3205.00.40.40 Blue (under: Products described in additional U.S. note 3 to section VI) (kg).
  • 3205.00.40.55 Other (under: Products described in additional U.S. note 3 to section VI) (kg).
  • 3205.00.50 Other (under: Other): General 6.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA,OM, P,PA,PE,S,SG); Column 2 72%.
  • 3205.00.50.10 Yellow (under: Other) (kg).
  • 3205.00.50.20 Red (under: Other) (kg).
  • 3205.00.50.30 Violet (under: Other) (kg).
  • 3205.00.50.40 Blue (under: Other) (kg).
  • 3205.00.50.50 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.