HTS Heading 3206

Other coloring matter; preparations as specified in note 3 to this chapter, other than those of heading 3203, 3204 or 3205; inorganic products of a kind used as luminophores, whether or not chemically defined

All 16 HTS codes under heading 3206 (other coloring matter), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.5%.

Every line of heading 3206

  • 3206 Other coloring matter; preparations as specified in note 3 to this chapter, other than those of heading 3203, 3204 or 3205; inorganic products of a kind used as luminophores, whether or not chemically defined.
  • 3206.11.00.00 Containing 80 percent or more by weight of titanium dioxide calculated on the dry matter (kg): General 6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 3206.19.00.00 Other (under: Pigments and preparations based on titanium dioxide) (kg): General 6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 3206.20.00 Pigments and preparations based on chromium compounds: General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 3206.20.00.10 Chrome yellow (under: Pigments and preparations based on chromium compounds) (kg).
  • 3206.20.00.20 Molybdenum orange (under: Pigments and preparations based on chromium compounds) (kg).
  • 3206.20.00.30 Zinc yellow (under: Pigments and preparations based on chromium compounds) (kg).
  • 3206.20.00.50 Other (under: Pigments and preparations based on chromium compounds) (kg).
  • 3206.41.00.00 Ultramarine and preparations based thereon (kg): General 1.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 7.5%.
  • 3206.42.00.00 Lithopone and other pigments and preparations based on zinc sulfide (kg): General 2.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 11%.
  • 3206.49 Other (under: Other coloring matter and other preparations).
  • 3206.49.10.00 Concentrated dispersions of pigments in plastics materials (kg): General 5.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 45%.
  • 3206.49.20.00 Preparations based on iron oxides (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 20%.
  • 3206.49.30.00 Preparations based on zinc oxides (kg): General 1.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 4.5%.
  • 3206.49.40.00 Preparations based on carbon black (kg): General Free; Special none; Column 2 20%.
  • 3206.49.55.00 Pigments and preparations based on hexacyanoferrates (ferrocyanides and ferricyanides) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 12%.
  • 3206.49.60 Other (under: Other): General 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 3206.49.60.10 Pigments and preparations based on cadmium compounds (kg).
  • 3206.49.60.50 Other (under: Other) (kg).
  • 3206.50.00.00 Inorganic products of a kind used as luminophores (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 45.5%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.