HTS Heading 3207
Prepared pigments, prepared opacifiers and prepared colors, vitrifiable enamels and glazes, engobes (slips), liquid lustres and similar preparations, of a kind used in the ceramic, enamelling or glass industry; glass frit and other glass, in the form of powder, granules or flakes
All 5 HTS codes under heading 3207 (prepared pigments), with their duty rates from the 2026 HTS Revision 23. General duty 3.1% to 6.5%.
Every line of heading 3207
- 3207 Prepared pigments, prepared opacifiers and prepared colors, vitrifiable enamels and glazes, engobes (slips), liquid lustres and similar preparations, of a kind used in the ceramic, enamelling or glass industry; glass frit and other glass, in the form of powder, granules or flakes.
- 3207.10.00.00 Prepared pigments, prepared opacifiers, prepared colors and similar preparations (kg): General 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3207.20.00.00 Vitrifiable enamels and glazes, engobes (slips) and similar preparations (kg): General 4.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 3207.30.00.00 Liquid lustres and similar preparations (kg): General 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3207.40 Glass frit and other glass, in the form of powder, granules or flakes.
- 3207.40.10.00 Ground or pulverized (under: Glass frit and other glass, in the form of powder, granules or flakes) (kg): General 6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 3207.40.50.00 Other (under: Glass frit and other glass, in the form of powder, granules or flakes) (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P, PA,PE,S,SG); Column 2 40%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.