HTS Heading 3401

Soap; organic surface-active products and preparations for use as soap, in the form of bars, cakes, molded pieces or shapes, whether or not containing soap; organic surface-active products and preparations for washing the skin, in the form of liquid or cream and put up for retail sale, whether or not containing soap; paper, wadding, felt and nonwovens, impregnated, coated or covered with soap or detergent

All 6 HTS codes under heading 3401 (soap), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4%.

Every line of heading 3401

  • 3401 Soap; organic surface-active products and preparations for use as soap, in the form of bars, cakes, molded pieces or shapes, whether or not containing soap; organic surface-active products and preparations for washing the skin, in the form of liquid or cream and put up for retail sale, whether or not containing soap; paper, wadding, felt and nonwovens, impregnated, coated or covered with soap or detergent.
  • 3401.11 For toilet use (including medicated products).
  • 3401.11.10.00 Castile soap (under: For toilet use (including medicated products)) (kg): General Free; Special none; Column 2 15%.
  • 3401.11.50.00 Other (under: For toilet use (including medicated products)) (kg): General Free; Special none; Column 2 4.4¢/kg + 30%.
  • 3401.19.00.00 Other (under: Soap and organic surface-active products and preparations, in the form of bars, cakes, molded pieces or shapes, and paper, wadding, felt and nonwovens, impregnated, coated or covered with soap or detergent) (kg): General Free; Special none; Column 2 4.4¢/kg + 15%.
  • 3401.20.00.00 Soap in other forms (under: Soap; organic surface-active products and preparations for use as soap, in the form of bars, cakes, molded pieces or shapes, whether or not containing soap; organic surface-active products and preparations for washing the skin, in the form of liquid or cream and put up for retail sale, whether or not containing soap; paper, wadding, felt and nonwovens, impregnated, coated or covered with soap or detergent) (kg): General Free; Special none; Column 2 4.4¢/kg + 30%.
  • 3401.30 Organic surface-active products and preparations for washing the skin, in the form of liquid or cream and put up for retail sale, whether or not containing soap.
  • 3401.30.10.00 Containing any aromatic or modified aromatic surface-active agent (kg): General 4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 53.5%.
  • 3401.30.50.00 Other (under: Organic surface-active products and preparations for washing the skin, in the form of liquid or cream and put up for retail sale, whether or not containing soap) (kg): General Free; Special none; Column 2 25%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.