HTS Heading 3307

Pre-shave, shaving or after-shave preparations, personal deodorants, bath preparations, depilatories and other perfumery, cosmetic or toilet preparations, not elsewhere specified or included; prepared room deodorizers, whether or not perfumed or having disinfectant properties

All 8 HTS codes under heading 3307 (pre-shave), with their duty rates from the 2026 HTS Revision 23. General duty 2.4% to 6%.

Every line of heading 3307

  • 3307 Pre-shave, shaving or after-shave preparations, personal deodorants, bath preparations, depilatories and other perfumery, cosmetic or toilet preparations, not elsewhere specified or included; prepared room deodorizers, whether or not perfumed or having disinfectant properties.
  • 3307.10 Pre-shave, shaving or after-shave preparations.
  • 3307.10.10.00 Not containing alcohol (under: Pre-shave, shaving or after-shave preparations) (kg): General 4.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 75%.
  • 3307.10.20.00 Containing alcohol (under: Pre-shave, shaving or after-shave preparations) (kg): General 4.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 81.7%.
  • 3307.20.00.00 Personal deodorants and antiperspirants (kg): General 4.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 75%.
  • 3307.30 Perfumed bath salts and other bath preparations.
  • 3307.30.10.00 Bath salts, whether or not perfumed (kg): General 5.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 75%.
  • 3307.30.50.00 Other (under: Perfumed bath salts and other bath preparations) (kg): General 4.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 75%.
  • 3307.41.00.00 "Agarbatti" and other odoriferous preparations which operate by burning (kg): General 2.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 3307.49.00.00 Other (under: Preparations for perfuming or deodorizing rooms, including odoriferous preparations used during religious rites) (kg): General 6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 73.2%.
  • 3307.90.00.00 Other (under: Pre-shave, shaving or after-shave preparations, personal deodorants, bath preparations, depilatories and other perfumery, cosmetic or toilet preparations, not elsewhere specified or included; prepared room deodorizers, whether or not perfumed or having disinfectant properties) (kg): General 5.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 75%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.