HTS Heading 3403

Lubricating preparations (including cutting-oil preparations, bolt or nut release preparations, antirust or anticorrosion preparations and mold release preparations, based on lubricants) and preparations of a kind used for the oil or grease treatment of textile materials, leather, furskins or other materials, but excluding preparations containing, as basic constituents, 70 percent or more by weight of petroleum oils or oils obtained from bituminous minerals

All 8 HTS codes under heading 3403 (lubricating preparations), with their duty rates from the 2026 HTS Revision 23. General duty 0.2% to 6.5%.

Every line of heading 3403

  • 3403 Lubricating preparations (including cutting-oil preparations, bolt or nut release preparations, antirust or anticorrosion preparations and mold release preparations, based on lubricants) and preparations of a kind used for the oil or grease treatment of textile materials, leather, furskins or other materials, but excluding preparations containing, as basic constituents, 70 percent or more by weight of petroleum oils or oils obtained from bituminous minerals.
  • 3403.11 Preparations for the treatment of textile materials, leather, furskins or other materials.
  • 3403.11.20.00 Containing 50 percent or more by weight of petroleum oils or of oils obtained from bituminous minerals (liters): General 0.2%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 0.4%.
  • 3403.11.40.00 Other (under: Preparations for the treatment of textile materials) (kg): General 6.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 49.5%.
  • 3403.11.50.00 Other (under: Preparations for the treatment of textile materials, leather, furskins or other materials) (kg): General 1.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 3403.19 Other (under: Containing petroleum oils or oils obtained from bituminous minerals).
  • 3403.19.10.00 Containing 50 percent or more by weight of petroleum oils or of oils obtained from bituminous minerals (liters): General 0.2%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO, JP, KR,MA,OM,P, PA,PE,S,SG); Column 2 0.4%.
  • 3403.19.50.00 Other (under: Other) (kg): General 5.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 2.9%(JP); Column 2 20%.
  • 3403.91 Preparations for the treatment of textile materials, leather, furskins or other materials.
  • 3403.91.10.00 Preparations for the treatment of textile materials (kg): General 6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 3%(JP); Column 2 25%.
  • 3403.91.50.00 Other (under: Preparations for the treatment of textile materials, leather, furskins or other materials) (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 3.25% (JP); Column 2 30%.
  • 3403.99.00.00 Other (under: Other) (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 3.25% (JP); Column 2 30%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.