HTS Heading 3404

Artificial waxes and prepared waxes

All 4 HTS codes under heading 3404 (artificial waxes and prepared waxes), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 3404

  • 3404 Artificial waxes and prepared waxes.
  • 3404.20.00.00 Of poly(oxyethylene) (polyethylene glycol) (kg): General Free; Special none; Column 2 54.5%.
  • 3404.90 Other (under: Artificial waxes and prepared waxes).
  • 3404.90.10.00 Containing bleached beeswax (under: Other) (kg): General Free; Special none; Column 2 30%.
  • 3404.90.51 Other (under: Other): General Free; Special none; Column 2 Free.
  • 3404.90.51.10 Of chemically modified lignite (kg).
  • 3404.90.51.50 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.