HTS Heading 3405
Polishes and creams, for footwear, furniture, floors, coachwork, glass or metal, scouring pastes and powders and similar preparations (whether or not in the form of paper, wadding, felt, nonwovens, cellular plastics or cellular rubber, impregnated, coated or covered with such preparations), excluding waxes of heading 3404
All 5 HTS codes under heading 3405 (polishes and creams, for footwear), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 3405
- 3405 Polishes and creams, for footwear, furniture, floors, coachwork, glass or metal, scouring pastes and powders and similar preparations (whether or not in the form of paper, wadding, felt, nonwovens, cellular plastics or cellular rubber, impregnated, coated or covered with such preparations), excluding waxes of heading 3404.
- 3405.10.00.00 Polishes, creams and similar preparations for footwear or leather (kg): General Free; Special none; Column 2 25%.
- 3405.20.00.00 Polishes, creams and similar preparations for the maintenance of wooden furniture, floors or other woodwork (kg): General Free; Special none; Column 2 25%.
- 3405.30.00.00 Polishes and similar preparations for coachwork, other than metal polishes (kg): General Free; Special none; Column 2 25%.
- 3405.40.00.00 Scouring pastes and powders and other scouring preparations (kg): General Free; Special none; Column 2 4.4¢/kg + 15%.
- 3405.90.00.00 Other (under: Polishes and creams, for footwear, furniture, floors, coachwork, glass or metal, scouring pastes and powders and similar preparations (whether or not in the form of paper, wadding, felt, nonwovens, cellular plastics or cellular rubber, impregnated, coated or covered with such preparations), excluding waxes of heading 3404) (kg): General Free; Special none; Column 2 25%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.